August 20, 2026
Drive along the future path of Sunset Boulevard toward Roseland Parkway right now and you will find dirt, silt fencing, and a sign promising something big is coming. That sign has been promising the same thing since 2023: a 100-acre, roughly $50 million city park with lighted ball fields, pickleball courts, a nine-hole disc golf course, and a pond you can walk around after dinner. Search the project online and you will find that number repeated on the city's own site, on neighborhood blogs, and in more than one local news roundup.
Here is what none of those posts spell out clearly. The thing opening this fall is not the 100 acres. It is closer to thirty.
Wilson Creek Park sits at the corner of Roseland Parkway and what the City of Celina still calls "the future Sunset Boulevard," a small detail worth sitting with. The road itself is not finished yet, which tells you something about how early-stage this whole corner still is even as the park construction moves forward around it.
The site is roughly a twelve-minute drive north of Mustang Lakes and within easy reach of Cambridge Crossing, and city planning documents describe a future Celina ISD elementary school and a fire station either inside or immediately adjacent to the park property. That combination, a park, a school, and a fire station going in together, is how Celina has built out most of its newer corridors over the past few years. It is a pattern worth knowing if you live anywhere in this stretch of the city, because it usually means more traffic on Roseland before it means more shade trees.
Crews broke ground on September 3, 2025, with the city crediting a community survey that pulled in more than 1,000 resident responses as the basis for the master plan. Dunaway and Dean Construction are the firms building it out.
Here is the math nobody has laid out side by side.
| Full Wilson Creek Park | Phase 1 (opening fall 2026) | |
|---|---|---|
| Acreage | About 100 acres | About 30 acres |
| Budget | Roughly $50 million | Roughly $12 million (see note below) |
| Status as of mid-2026 | Long-range master plan | Under construction |
Thirty acres is not nothing. But it is also less than a third of what the renderings show, and the city has not published a phase-by-phase breakdown of which specific amenities land in this first thirty acres versus the seventy that follow. That absence of detail is the actual story here. If you are hoping to walk the pond overlook or send the kids to the disc golf course the week it opens, there is no public document yet that confirms either one arrives with Phase 1. The safest plan is to check the city's Wilson Creek Park page again closer to opening rather than assume the full amenity list shows up on day one.
Reporting on what Phase 1 actually costs has been surprisingly inconsistent for a project this well documented. A Community Impact article tied directly to the September 2025 groundbreaking, and updated as recently as May 2026, put the first phase at 30 acres and about $11.87 million. A separate Community Impact roundup published in December 2025 cited a similar cost figure but described the first phase as 40 acres instead of 30. And a Local Profile report from the same week as the groundbreaking quoted a first-phase cost of $30 million, nearly triple the other estimate.
None of these are pulled from thin air. They all trace back to the same project. But if you have seen one of these numbers repeated somewhere and assumed it was settled, it is worth knowing the local coverage itself has not agreed on the figure. For a resident deciding how much to get invested in this fall's opening, the acreage is the more reliable numbers to hold onto: 30 acres now, 100 eventually.
The city's own project page lists ten features for the completed park: lighted diamond fields, lighted multi-use fields, lighted pickleball courts, a pond with open space, concrete trails, playgrounds, a pavilion, a combined restroom and concession building, soft surface trails, and a nine-hole disc golf course. That is the official list, straight from Celina's Parks and Recreation project page.
A few other write-ups have added to it. One local news recap of the groundbreaking mentioned a dog park. A couple of outdoor-guide style posts have mentioned a dedicated cricket field. Neither of those two features appears on the city's own official amenity list for Wilson Creek Park. That does not mean they are wrong, master plans get refined as construction proceeds, but it does mean a resident planning a specific activity around this park, bringing the dog, organizing a weekend cricket match, should confirm directly with the city rather than treating every blog post as gospel. The gap between the official list and the version that has spread across secondary coverage is a small thing, but it is exactly the kind of gap that trips people up when they show up expecting an amenity that was never formally approved.
If you have lived in this part of Celina for more than a summer, you already know Old Celina Park at 12670 FM 428. It is where Splash & Blast happened again this year on June 27, drawing thousands for water slides, a BMX stunt show, and a fireworks finale timed to the America250 celebration. It is where the Celina library runs its Storybook Trail, where the catch-and-release pond gives you a quiet hour on a weekday evening, and where the walking trail loops past the ball fields that host the city's youth sports leagues.
Wilson Creek Park is not trying to replace that. It is trying to give the newer neighborhoods along Roseland Parkway and Sunset Boulevard, the ones without a short walk to FM 428, something closer to home. That is a reasonable goal for a fast-growing corridor. It just is not the same as a finished 100-acre destination arriving all at once this fall.
If you live near this corner of the city, three things are worth tracking between now and whenever the ribbon actually gets cut. First, whether the city publishes a specific amenity list for Phase 1 rather than the long-range master plan version. Second, whether Sunset Boulevard itself gets far enough along to handle the traffic a new park will bring, since a park entrance on an unfinished road tends to create its own kind of Saturday morning bottleneck. Third, whether that elementary school and fire station attached to the site get their own construction timelines announced, since those two additions will shape how this whole corner feels well before the final seventy acres of park are finished.
None of this makes Wilson Creek Park less worth anticipating. Thirty acres of new lighted fields, trails, and pickleball courts is a genuine addition to daily life in this part of Celina, and it is arriving on a timeline the city has held steady on for close to a year now. It just is not the full 100-acre picture that's been circulating since 2023, and knowing the difference is the difference between showing up this fall pleasantly surprised or mildly annoyed that the disc golf course isn't open yet.
If you are watching how this corner of Celina keeps filling in, whether it's a new park, a new school zone, or the next phase of construction along Roseland Parkway, that is exactly the kind of hyper-local tracking LivingWell Realty does for North Texas neighborhoods every month. Curious what your own home might be worth as this part of Celina keeps building out? Get Your Home Value.
Stay up to date on the latest real estate trends.
Local Information
Three towns, one farm road apart — and very different bets.
New Builder Homes
Highland Homes | Davenport Floorplan | 4 Beds | 3 Baths | 2317 Sq Ft
Prosper Tx
We'd love to hear from you! Whether you're buying, selling, or just exploring your options, we're here to provide answers, insights, and the support you need. Contact us and start planning your next move.