Celina Tx August 20, 2026
Drive along the future path of Sunset Boulevard toward Roseland Parkway right now and you will find dirt, silt fencing, and a sign promising something big is coming. That sign has been promising the same thing since 2023: a 100-acre, roughly $50 million city park with lighted ball fields, pickleball courts, a nine-hole disc golf course, and a pond you can walk around after dinner. Search the project online and you will find that number repeated on the city's own site, on neighborhood blogs, and in more than one local news roundup.
The key distinction is that the first phase opening this fall covers only part of the planned park. It is about 30 acres, not the full 100.
Wilson Creek Park sits at the corner of Roseland Parkway and what the City of Celina still calls "the future Sunset Boulevard," a small detail worth sitting with. The road itself is not finished yet, which tells you something about how early-stage this whole corner still is even as the park construction moves forward around it.
The site is roughly a twelve-minute drive north of Mustang Lakes and within easy reach of Cambridge Crossing, and city planning documents describe a future Celina ISD elementary school and a fire station either inside or immediately adjacent to the park property. That combination, a park, a school, and a fire station going in together, is how Celina has built out most of its newer corridors over the past few years. It is a pattern worth knowing if you live anywhere in this stretch of the city, because it usually means more traffic on Roseland before it means more shade trees.
Crews broke ground on September 3, 2025, with the city crediting a community survey that pulled in more than 1,000 resident responses as the basis for the master plan. Dunaway and Dean Construction are the firms building it out.
Here is the comparison side by side.
Full Wilson Creek Park | Phase 1 (opening fall 2026) | |
|---|---|---|
Acreage | About 100 acres | About 30 acres |
Budget | Roughly $50 million | Roughly $12 million (one estimate) |
Status as of mid-2026 | Long-range master plan | Under construction |
Thirty acres is not nothing. But it is also less than a third of what the renderings show, and the city has not published a phase-by-phase breakdown of which specific amenities land in this first thirty acres versus the seventy that follow. If you are hoping to walk the pond overlook or send the kids to the disc golf course the week it opens, there is no public document yet that confirms either one arrives with Phase 1. The safest plan is to check the city's Wilson Creek Park page again closer to opening rather than assume the full amenity list shows up on day one.
Reports on the cost of Phase 1 give different figures. A Community Impact article tied directly to the September 2025 groundbreaking, and updated as recently as May 2026, put the first phase at 30 acres and about $11.87 million. A separate Community Impact roundup published in December 2025 cited a similar cost figure but described the first phase as 40 acres instead of 30. And a Local Profile report from the same week as the groundbreaking quoted a first-phase cost of $30 million, nearly triple the other estimate.
These reports concern the same project, but their cost estimates differ. The acreage reports differ too: the city describes Phase 1 as about 30 acres, while the separate roundup says 40. The city describes the full park as about 100 acres.
The city's own project page lists ten features for the completed park: lighted diamond fields, lighted multi-use fields, lighted pickleball courts, a pond with open space, concrete trails, playgrounds, a pavilion, a combined restroom and concession building, soft surface trails, and a nine-hole disc golf course. That is the official list, straight from Celina's Parks and Recreation project page.
A few other write-ups have added to it. One local news recap of the groundbreaking mentioned a dog park. A couple of outdoor-guide style posts have mentioned a dedicated cricket field. Neither of those two features appears on the city's own official amenity list for Wilson Creek Park. That does not mean they are wrong; master plans get refined as construction proceeds. Residents planning a specific activity around this park, such as bringing the dog or organizing a weekend cricket match, should confirm directly with the city.
If you have lived in this part of Celina for more than a summer, you already know Old Celina Park at 12670 FM 428. It is where Splash & Blast happened again this year on June 27, drawing thousands for water slides, a BMX stunt show, and a fireworks finale timed to the America250 celebration. It is where the Celina library runs its Storybook Trail, where the catch-and-release pond gives you a quiet hour on a weekday evening, and where the walking trail loops past the ball fields that host the city's youth sports leagues.
Wilson Creek Park is not trying to replace that. It is trying to give the newer neighborhoods along Roseland Parkway and Sunset Boulevard, the ones without a short walk to FM 428, something closer to home. That is a reasonable goal for a fast-growing corridor. It just is not the same as a finished 100-acre destination arriving all at once this fall.
If you live near this corner of the city, three things are worth tracking between now and whenever the ribbon actually gets cut. First, whether the city publishes a specific amenity list for Phase 1 rather than the long-range master plan version. Second, whether Sunset Boulevard itself gets far enough along to handle the traffic a new park will bring, since a park entrance on an unfinished road tends to create its own kind of Saturday morning bottleneck. Third, whether that elementary school and fire station attached to the site get their own construction timelines announced, since those two additions will shape how this whole corner feels well before the final seventy acres of park are finished.
None of this makes Wilson Creek Park less worth anticipating. A 30-acre first phase is a genuine addition to daily life in this part of Celina, and it is arriving on a timeline the city has held steady on for close to a year now. The full 100-acre park is a longer-term plan, and the specific amenities included in Phase 1 have not yet been confirmed publicly.
If you are watching how this corner of Celina keeps filling in, whether it's a new park, a new school zone, or the next phase of construction along Roseland Parkway, that is exactly the kind of hyper-local tracking LivingWell Realty does for North Texas neighborhoods every month. Curious what your own home might be worth as this part of Celina keeps building out? Get Your Home Value.
Stay up to date on the latest real estate trends.
Celina Tx
We'd love to hear from you! Whether you're buying, selling, or just exploring your options, we're here to provide answers, insights, and the support you need. Contact us and start planning your next move.